NWK-WTC Mandatory Hack River Bridge lift for essential marine traffic planned for 2:30pm Sat 3/6. Allow extra travel time. We apologize for the inconvenience.
gkazin
Posts: 7617
Joined: Tue Sep 23, 2014 10:05 pm
Location: New Jersey

Re: PATH Problems, 03/06/2021

Post by gkazin »

Sat, Mar 6 at 11:44 AM
NWK-WTC is operating with en-route delays. Trains are operating at slower speeds for single-track operation and may be held at Journal Square intermittently. Allow extra travel time. We apologize for the inconvenience.

Sat, Mar 6 at 2:03 PM
NWK-WTC delayed. Crews preparing for mandatory Hackensack River Drawbridge lift. We apologize for the inconvenience.

Sat, Mar 6 at 3:13 PM
PATH resuming normal service. Hack River Drawbridge lift successfully completed.